Welcome: HANGZHOU RELIABLE CABLE INDUSTRY CO.,LTD
INFO@RCICABLE.COM 0571-87961814

Silane Crosslinked Halogen Free Low Smoke Flame Retardant Polyolefin Cable Material For Automotive Cable

Silane Crosslinked Halogen Free Low Smoke Flame Retardant
Polyolefin Cable Material For Automotive CableThe product owns excellent mechanical property, electrical performance, flame
resistance,and processability, which meets RoHS, REACH and other related
environmental protection requirements. The product comply with ISO 6722 standard.

EMAIL

Silane Crosslinked Halogen Free Low Smoke Flame Retardant Polyolefin Cable Material For Automotive Cable

Description

The product owns excellent mechanical property, electrical performance, flame resistance,and processability, which meets RoHS, REACH and other related environmental protection requirements. The product comply with ISO 6722 standard.

Application

1722094851214.png

Performance

1722094877378.png

1722094895344.png

The smoke toxicity shall be negotiated according to the demand of application.

Use Methods 

1. Mixing: Mix the Component A and Component B evenly, add them into the hopper. If the color required, use the EVA base materials (the color master batch should be dried). The material should be use up within 2 hours after unpacking.(It can ’t be dried.) The external water can’t be brought in during the process. 

2. Threaded Rod Type: Compression Ratio:1.5±0.2 

3. Extrusion Temperature:

1722094993014.png

Control the melt temperature at 160±10℃. The extrusion temperature needs to be adjusted according to the actual situation. 

4. Pay-off Speed: Without the effect of smoothness and performance, the faster,the better. 

5. Cross-link:The crosslink of the cable:Natural crosslink or Water bath(Steam).Natural Crosslink:Temperature 15-25 ℃ ,crosslink will be finished around 7days.When temperature is higher than 25℃,crosslink will be finished around 3days.Water bath or Steam:Should control the temperature around 60 ℃ in order to keep it from sticking together,it will finish about 4hours. The thickness of the test piece is 1mm. If thickness >1mm, the crosslink time should be adjusted according to actual situation. Full performance test, water bath (steam) 50 ℃, more than 8 hours, to ensure the material is fully crosslinked. 


Package, Transport and Storage: 

Package:Vacuum packed. Transport: Can’t be exposed to the sun or rain, or suffer mechanical damage. Storage:Should be stacked on the pallet in a clean and dry warehouse. Valid Period:6 months.

INQUIRY

CATEGORIES

LATEST NEWS

CONTACT US

Contact: James

Phone: 13588294530

E-mail: INFO@RCICABLE.COM

Whatsapp:0086-13588294530

Add: Building 1-107, Jincheng Xintiandi, Jincheng Street, Linan District, Hangzhou City, Zhejiang Province, China