Welcome: HANGZHOU RELIABLE CABLE INDUSTRY CO.,LTD
INFO@RCICABLE.COM 0571-87961814

Building Wire Cable Compound

Silane Crosslinked Halogen Free Low Smoke Flame Retardant
Polyolefin Cable Material For Building Wire

EMAIL

Silane Crosslinked Halogen Free Low Smoke Flame Retardant Polyolefin Cable Material For Building Wire

Description 

The product owns excellent mechanical property and the faster crosslink speed. Comply with JB/T 10436-2004,Applicable for building wire.

Application

1722087428057.png

Performance

1722087486647.png

1722087872298.png

Use Methods

1. Mixing: Mix the Component A and Component B evenly, add them into the hopper. If the color required, use the EVA base materials (the color masterbatch should be dried). The material should be use up within 2 hours after unpacking.(It can’t be dried.)The external water can’t be brought in during the process. 

2. Threaded Rod Type: Low smoke halogen free special screw Compression Ratio: 1.5±0.2 

3. Extrusion Temperature:

1722087976682.png

Control the melt temperature at 160±10℃. The extrusion temperature needs to be adjusted according to the actual situation. 

4. Double Color Cable:Color line can use Component A and EVA base materials together,without or with a small number of Component B. 

5. Pay-off Speed: Without the effect of smoothness and performance, the faster,the better. 

6. Cross-link: Natural crosslink or Water bath(Steam). Natural Crosslink: Temperature 15-25℃, crosslink will be finished around 7days. When temperature is higher than 25℃, crosslink will be finished around 3days. Water bath or Steam: should control the temperature around 60-70℃ in order to keep it from sticking together, it will finish about 4hours. The thickness of the test piece is 1mm. If thickness >1mm, the crosslink time should be adjusted according to actual situation. Full performance test, water bath (steam) 65 ℃, more than 8 hours, to ensure the material is fully crosslinked.


Package, Transport and Storage: 

Package:Vacuum packed. Transport: Can’t be exposed to the sun or rain, or suffer mechanical damage. Storage:Should be stacked on the backing plate in a clean and dry warehouse. Valid Period:6 months.


INQUIRY

CATEGORIES

LATEST NEWS

CONTACT US

Contact: James

Phone: 13588294530

E-mail: INFO@RCICABLE.COM

Whatsapp:0086-13588294530

Add: Building 1-107, Jincheng Xintiandi, Jincheng Street, Linan District, Hangzhou City, Zhejiang Province, China